Photo Gallery - Page 1: These construction photos of Claire's Vineyard were taken from July through September, 2002.


The large pieces of the stormwater drainage system 
have arrived.

 


The engineers are checking the survey for exact placement.



The bulldozer is removing the piece
from the flat bed truck.



The workers carefully place the 
storm water pipes in the ground.


Below, the first of the storm water boxes 
being put into place at Claire's Vineyard.



Jack Jernigan (Developer) looks
on as the first storm water pipe is
being placed into the ground.



The streets of Claire's Vineyard 
are being cleared.

Jack Jernigan and David Gamble 
prepare to clear a lot in Claire's 
Vineyard in September 2002.

David pointing out where the 
driveway should start. 